← Services

Basement Finishing

Gain a whole new room without moving. We design and build your basement from end to end — one contractor, one fixed price, permits included. Across the Outaouais.

★ 5-Star Google
✓ RBQ 5784-5851-01
✓ Insured
✓ 20+ Years Experience
Turnkey basement finishing

It's the cheapest space to gain in a house — the structure is already there. The trick is finishing it properly.

Family room, home theatre, bedroom, bathroom, office or wet bar: we design and execute the entire project. Framing, insulation, soundproofing, electrical, plumbing, drywall, flooring and finishes — a single point of contact, from the plan to the last coat of paint.

We serve Gatineau, Aylmer, Hull, Chelsea, Cantley, Val-des-Monts and the entire Outaouais region. The home consultation is free with no obligation.

What the service includes
✓ Design and project plan
✓ Framing, insulation and soundproofing
✓ Electrical (licensed electrician)
✓ Plumbing — bathroom and wet bar
✓ Drywall, taping and paint
✓ Flooring — vinyl, tile or carpet
✓ Bedroom with compliant egress window
✓ Full management and permits included

Planning a basement project?

Free Estimate (819) 962-3546
Finished basement bathroom in the Outaouais

A finished basement, run by one contractor

Finishing a basement means coordinating half a dozen trades: framer, electrician, plumber, drywaller, painter, flooring installer. On your own, it's a scheduling and accountability headache. We handle it all, in the right order, with one accountable team and one fixed price.

No contractors pointing fingers when something goes wrong. One plan, one schedule, one contract — and a cohesive result from start to finish.

Rigid foam, batt insulation and vapour barrier in a basement renovation in the Outaouais

We fix moisture before we finish

A beautiful basement built over a moisture problem is money thrown away. Before the first stud goes up, we assess the basement: water infiltration, condensation, drainage. We install an air-gap dimpled membrane, proper insulation and vapour barrier, and plan dehumidification where needed.

The Verano team is on site, supervised by Pierre-Michel Légaré. RBQ-licensed and insured, with 20 years of experience across the Outaouais.

20+Years Experience
100+Projects Completed
5★Google

Basement finishing across the Outaouais

We finish basements throughout the Gatineau area and the Collines-de-l'Outaouais. From townhouses with a compact basement to large rural homes with walk-out basements, we fit the plan to your space, your budget and your municipality's requirements.

Dedicated pages by municipality: basement finishing in Gatineau, Chelsea, Cantley, Aylmer and Val-des-Monts. To start your project, call Pierre-Michel directly at (819) 962-3546.

Free Estimate
Our Work — basements
Basement bathroom
Basement kitchenette and coffee nook
Basement bedroom with egress window
Basement under construction
Frequently Asked Questions
How much does it cost to finish a basement?

The price depends on the square footage, whether you add a bathroom or wet bar, the number of rooms and the level of finish. It's almost always cheaper than adding space above grade because the structure is already there. We travel across the Outaouais for free to assess the project and give you a fixed turnkey price with no surprises.

Do I need a permit to finish a basement?

Yes. Finishing a basement requires a renovation permit: the City of Gatineau for Gatineau and Aylmer, the MRC des Collines-de-l'Outaouais for Chelsea, Cantley and Val-des-Monts. A bedroom requires a code-compliant egress window. We handle the permit and the compliance.

How do you handle moisture in a basement?

We assess moisture before finishing anything: an air-gap dimpled drainage membrane, proper insulation and vapour barrier, and a dehumidification or drainage plan where needed. We never finish over a damp basement. In the Gatineau area, that's the number-one mistake that ruins a finished basement.

Do you do the electrical and plumbing yourselves?

We manage the whole project and coordinate our licensed electricians (CMEQ members) and plumbers (CMMTQ members). You sign one contract and deal with one responsible contractor, from the plan to the last coat of paint. The specialized work is done by licensed professionals and is Code-compliant.

How long does finishing a basement take?

Most basements are finished in 4 to 8 weeks depending on scope. Because one contractor coordinates framing, electrical, plumbing, drywall and finishes, you avoid the delays between subcontractors. We give you a precise schedule before we start.

Can you add a bedroom or bathroom in the basement?

Yes. A legal bedroom needs a code-compliant egress window; a bathroom needs proper drainage (sometimes a sewage-ejector pump if the basement sits below the sewer line). We plan both from the start so the layout is compliant and functional.

Other Services